DC Layout and Optimization: Completed an overall plant layout that meets all of Ford’s customer Ergonomic and Safety requirements. Analyze Plant Flow to identify and remove bottlenecks; Incorporate Flow Constraints in new plant design. Complete Overall Warehouse Sizing initiative based on both Ford customer and Industry Best Practices. Ensure plant existing layout is accurately reflected in CAD drawings. Explore alternative layout options utilizing CAD design and presenting options to plant management team
Design Work Cell and Racking Layouts: prepare equipment requirements list to implement solutions. Utilize Data Analysis tools to gather, analyze, and develop action plans for plant move initiatives.
Manage installation of MHE related to new work cell design: Work with operations and installation teams to ensure proper installation of equipment
Project Management: Interface with Ford customer Executive, Operations, and hourly (unionized) team on various initiatives at the Oakville MSC. Coordinate work plans between Ford team and external contractors. Interface and direct hourly unionized staff related to the “shutdown”
DC Operational Optimization: Analyze DC to identify and improve operations related to shipping, receiving, inventory control, slotting, etc. “Just in” Sequence Parts Delivery (Cell Operations, Inventory Storage, and Layout Opportunities)
Shoppers
Loblaws IE group
Loblaws IT group
BIS Consulting SC Inc. is a full-service North American Supply Chain, Logistics, and Distribution Consulting firm. With over 20 years of industry experience, BIS has provided excellent service in the areas of supply chain and distribution.